All RCx findings have been implemented and are expected to accrue two-year returns of investment greater than 90%. Upgrades included weatherization, plumbing fixtures, efficient lighting and building automation enhancements. RCx identified actions estimated to reduce energy use at E-109 by an additional 18%. Utilizing the Sustainable Building module within ENERGY STAR Portfolio Manager, documentation of the LEED O+M process resulted in the project meeting 100% of the Guiding Principles.Īnother major project goal was to utilize the retro-commissioning (RCx) process (EA Credit 2) to further improve energy and water performance in the building and realize the economic benefits of LEED O+M. The Coyote is designed and built at Northrop Grumman’s state-of-the-art launch vehicle production facility in Chandler, Arizona and launches from San Nicholas Island, California Pacific Missile Range Facility, Hawaii White Sands Missile Range, New Mexico and Wallops Flight Facility, Virginia. With weather conditions looking good, Rocket Labs first Electron launch from the Wallops Island Flight Facility is a go for today, and the launch window is set for 6-8 p.m. It also aimed to demonstrate the power of retro-commissioning (RCx) as a tool for improving facility operations and energy efficiency.īeyond helping to meet NASA's Sustainable Buildings Goals, the project focused on complying with the Federal Guiding Principles for High Performance Sustainable Buildings and their emphasis on integrated operations and maintenance, optimized energy performance, conservation of water resources, enhanced indoor environmental quality and reduced materials impact. The study sought a case study for using the LEED O+M to measure sustainable development performance of existing buildings. The project grew out of a study aimed at achieving NASA's Sustainable Buildings Goals, which entail reducing energy consumption intensity by 30% and meeting federal Guiding Principles at 15% of its locations by FY2015. Constructed in 2007, it provides office, lab, and machine shop facilities for several technical departments staffed by 87 employees. Building E-109 is a multi-functional 52,779 square foot, two-story building. Wallops Flight Facility, located on Virginias Eastern Shore, was established in 1945 by the National Advisory Committee for Aeronautics as a center for. Central Command.Located on the eastern shore of Virginia, Wallops Flight Facility (WFF) is a center for NASA’s suborbital space and earth science research programs. ORS-1 was initiated as a result of a requirement to the ORS office from the commander of U.S. "Our team was able to develop, integrate, test and launch this system in just over 30 months which is a remarkable achievement," she said. Rapidly developing and fielding ORS-1 is an important step to demonstrating the possibilities to meet emerging and persistent warfighter needs in operationally relevant timelines, Colonel Welsch said. Their teamwork and dedication is simply inspiring." "The men and women of the Space Development and Test Directorate, the Operationally Responsive Space Office, and our industry partners of Goodrich, ATK, and Orbital have all worked tirelessly to move forward on the concept of a responsive space capability designed to support the warfighter. "Words cannot express how proud I am of the entire ORS-1 team," she said. ORS-1 is the Operationally Responsive Space Office's first operational prototype satellite and represents the potential of low-cost, tactically focused satellites designed to provide critical battlespace awareness capabilities to the joint warfighter. The WCA is focused on information exchange between resident contractors and the government work. Carol Welsch, the directorate's acting director and the ORS-1 mission director. This marks a great achievement by the Space and Missile Systems Center's Space Development and Test Directorate, the Operationally Responsive Space Office and their contractor teams, according to Col. EDT June 29 from the NASA Wallops Flight Facility on Wallops Island, Va. (AFNS) - An Air Force team successfully launched the first Operationally Responsive Space prototype satellite aboard a Minotaur I launch vehicle at 11:09 p.m. Live coverage and the most up-to-date schedule of all upcoming orbital rocket launches, including SpaceX, ULA, Arianespace and others.
0 Comments
Leave a Reply. |